Disaster contingency planning

The Taina County government environmental protection bureau stable ash dregs buries the field urgent
contingency plan

1. Goal
 To make the field of emergency in the event of unexpected events, all my colleagues in the field of emergency response plans
 quickly based on the operating system standards,make this field able to fully control affairs condition in good time, the
 contingency dividing the work to adopt a necessity conduct and actions, make the disaster reduced to lowest degree, define this
 emergency response project especially.

2. Scope
 This content trash buries the surface, the water seepage Sewage treatment plant, the office all operation maintenance and the
 active area, possibly and creates pollutes the neighbor border area scope.

3. Term definition
 Emergency means the of the gross negligence of operation, or an irresistible natural disasters, which happened on the field of
 danger or pollution events (such as casualty, fire, earth embankment collapse, sewage spills, etc), according to their degree can be
 divided into three levels of emergencies.
  3.1First-level emergencies
   Refers to the threat of harm to the incident and rescue emergency response without the need for evacuation of personnel to
   staff the control of impact and limited to small areas.
 3.2Second-level emergency events
   Means a greater impact in the field of dangerous or regional events, and will cause a threat of life and property, judgment may
   endanger regional emergency evacuation of persons, and may require external support.
  3.3Third-level emergencies
   Refers to a serious accident or large regions over the perimeter of the field, this time to evacuate the object may be extended
   to site residents and farming.

4. Power and responsibility
 
4.1First-level emergencies
   Contingency of events determined by the senior clerk of the emergency response Group began to perform and any Commander,
   by the Director of supervision.At night or on holidays when the event occurs, by the field staff for the Commander on duty,
   and immediately report to the Director of accident scenarios, and seeking officers to the scene to carry out its mandate, until the
   group leader or Director to take over, ex post facto reporting to the Council this part.
  4.2Second-level emergency events
   The plant manager serves as commanding officer, and set up command centers, command center should be near the scene of the
   incident and take effective response measures and, if necessary, immediately notify the off-site support unit support, to the
   bureau headquarters report (if necessary report to the Government Employee Ethics Unit.
  4.3Third-level emergencies
   Related to disaster relief by the government unit responsible for command scheduling, grouping with the emergency response
   field, and to keep the Council headquarters and the Government Employee Ethics Unit report.
  4.4Contingency measures
  4.4.1Treatment facility failure should identify causes, records management, emergency repair mechanical time and take the
    following measures:
   (1) If necessary, suspension of seepage water into the stream.
   (2) Take the necessary response and handling measures.
   (3) Puts the running water part withdrawing regulating pondage, to adjust the again.
  4.4.2Water storage facilities leak, immediately patches, packing.
  4.4.3The abnormal operation, Summer storm or typhoon generated a lot of water seepage caused by leaking water treatment
    facilities can not be processed when:
   (1)Immediately go to bury the area patrol rain, the sewage diversion system is is unimpeded avoids the rain water flowing
     in the Sewage treatment plant influence following processing.
   (2)Temporary closure of a leachate collection well into the flow gate, will Showers accumulated a large number of temporary
     barrier in the leachate landfill area, again after the storm flow to maintain the quality of treated water.
  4. 5After the event fill out the "Emergency Event Log Report " reported.

5. Content
 
5.1The emergencies Identification:
 5.1. 1Impact on the environment of the emergency are:
   (1) The harmful chemistry material leaks.
   (2) Combustible material fires.
   (3) Buries the surface methane to cause the fire.
   (4) Take place occupation disaster.
   (5) The natural disaster occurs (for example rains continuously, earth embankment avalanche).
   (6) The sewage treatment field occurs exceptionally discharge
   (7)Events due to a sudden emission of air pollutants.
  5.1.2Immediately on the field against the safety of the emergency event are:
   (1) This field encounters threatens the telephone to threaten.
   (2) This field encounters illegal member destroyed.
   (3) This field was surrounded by the people to petition the petitioner, the petition populace to surround.
  5.2Whether determination of principle as emergencies:
   (1) According to the event actual state and report of engineering personnel, determined by the factory manager.
   (2) After the emergencies determines, manager should announce and draw up the countermeasure immediately.
  5.3Emergency preparedness and response programmes of the development, testing:
  (1) Emergency preparedness: emergency by the commanders on its own initiative when dispatching (ambulance, rescue,
    rescue-related matters).
  (2) Formulation of the strain plan: By is related the personnel according to the different emergencies to discuss together
    formulates, approves after manager implements in view of this most important fire, the professional disaster, the sewage
    overflow, damage and representation petitions containing the event handling to develop contingency plans (for example
    appendix one to appendix four).
  (3) Meet an emergency the test of project and practice:Every half year in double week rest to go to work of on Saturday